Mullins Mechanical is proud to have been selected to install the mechanical system at the new 1.25 million square feet distribution center in Madison, AL. Project Coretta required 128 helicopter lifts to install the rooftop units and fans. The HVAC system included low-temperature computer room units, sheet metal ductwork in offices and restrooms, HVLS fans, and louvers for ventilation.
The Mullins team also installed an all-welded natural gas piping loop, domestic water piping loop, and plumbing systems including the fixtures in various break-rooms and office spaces.